500KV Zhezhong Substation UHV Project
Project Introduction
Huitong won one bid of State Grid in 2013 to be the provider of angel
steel tower for Xizhe UHV project. The total weight of products is up
to 2687 tons. The project starts from left bank of Xiluo Ferry of
Jinsha River and ends in Zhejiang Section of Jinhua UHV transmission
line. This project is the first UHV DC project located in Zhejiang
Province. The entire length is 1,680 km, among which 143 km is within
Zhejiang Province. The transmission line mainly passes through
Jiangshan, Qijiang, Kecheng, Longyou, Wucheng and Wuyi. The value of
all transmission towers reaches 200 million RMB. When the UHV AC
project between North Zhejiang Province and Fuzhou is completed, its
immediate transmission capacity will be 6.8 million kw. In the long
term, the capacity can be future increased to 10.5 million kw and
above. Hydropower, nuclear power and wind power of Fujian Power Grid
can be sent to Zhejiang Province.
Huitong placed great importance on this project. A special team was
set up to ensure that each procedure was under strict management. In
this project, a large amount of broad-scale 5k5 strain modules are
adopted. Besides, 2-angel-steel modules needed to be stitched to
4-angel-steel modules. We have overcome various technical difficulties
to achieve foolproof. In terms of lofting, each error was verified
repeatedly. Machining allowance was considered cautiously. Besides,
high speed drilling must be adopted to fulfil manufacturing
requirements of steel Q420. Comparing to traditional drilling, high
speed drilling requires longer production cycle. Our employees
maintained high efficiency throughout the whole project and completed
production task on time.